Login
  New Member Sign Up
Members
Log In Log In
Print Subscription Bookmark EMAsia
Click to navigate back to homepage
Friday, November 21, 2008
| | | | | | | | |
Go to EM Asia (China)
 
POLL
As major EMS/ODM companies continue to face strategic and operational challenges, will we see another giant merger in 2008?
Yes, in the EMS space
Yes, in the ODM space
No, highly unlikely
View Results
 
 
 
 
 
 
PRINT EDITION > MAY 2008
Sponsored Links

True parallel placement

1 May 2008

A-Series

• Multiple heads that place up to 121,000 components/hour (IPC9850 reference speed) with smooth robot movements and constant component monitoring

• Single-digit defects per million performance and board quality levels of up to 99.999 percent

• Accuracy for complex, fine-pitch and odd-form components is as good as 20 microns at 3 sigma

• Product changeovers take typically less than 6 minutes

• Can be seamlessly integrated into logistics control infrastructures for integrated factory automation

Assembléon
www.assembleon.com


 
SPONSORED LINKS
Sponsored Links
 
ADVERTISEMENT
 
 
| | | | | | |
Back to top
 
  © 2007 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this web site is subject to its Terms and Conditions of Use. View our Privacy Policy.