Login
  New Member Sign Up
Members
Log In Log In
Print Subscription Bookmark EMAsia
Click to navigate back to homepage
Friday, December 5, 2008
| | | | | | | | |
Go to EM Asia (China)
 
POLL
As major EMS/ODM companies continue to face strategic and operational challenges, will we see another giant merger in 2008?
Yes, in the EMS space
Yes, in the ODM space
No, highly unlikely
View Results
 
 
 
 
 
 
PRINT EDITION > OCTOBER 2005
Sponsored Links

Advanced rework system

27 October 2005

Summit 1800



  • Increased 65-mm alignment field of view with digital and optical zoom

  • Windows-based SierraMate 7.0 software

  • Automatic prism shuttle designed to accommodate large components
  • Digital split image allows the operator to see bumps, leads or pads of large devices at a high magnification

  • Independent, programmable motions for both pick-up and top heater height

  • Component pick-up tube features 3608 Theta control and automatic alignment height

  • Standard board handling of 18x 22", placement accuracy of 0.0005 to 0.001" and magnification capability from 2 to 40x



  • VJ Electronix Inc. Fax: 1-978-425-9648
    www.vjelectronix.com

     
    SPONSORED LINKS
    Sponsored Links
     
    ADVERTISEMENT
     
     
    | | | | | | |
    Back to top
     
      © 2007 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
    Use of this web site is subject to its Terms and Conditions of Use. View our Privacy Policy.